| SOW and LIB submitted |
B: 119. Manage Restoration Projects |
|
08/31/2016 |
12/23/2016 |
| List of Selected Projects (and contingency projects) to be implemented |
C: 114. Select habitat improvement actions and identify possible projects for next fiscal year |
|
08/31/2016 |
08/31/2016 |
| Project databases that are maintained and up to date. |
D: 160. Update Project Database |
|
02/28/2017 |
02/28/2017 |
| Disseminated data |
E: 161. Create informal summary reports and maps |
|
02/28/2017 |
02/28/2017 |
| 5 outreach sessions completed |
F: 99. Conduct field and classroom education at local schools |
|
02/28/2017 |
02/28/2017 |
| Technical review and input provided to various policy and planning efforts |
G: 122. Input to various Tribal planning and policy efforts |
|
02/28/2017 |
02/28/2017 |
| Completed environmental documentation |
H: 165. Environmental Compliance |
|
02/28/2017 |
02/28/2017 |
| Completed Annual Report submitted to BPA |
I: 132. Produce Project Annual Report for FY16 Mar2016-Feb2017 |
|
02/28/2017 |
02/28/2017 |
| Outmigration estimate and other data from screw traps |
J: 157. Operate rotary screw traps for steelhead |
|
07/15/2016 |
06/30/2016 |
| Complete three pass surveys in Satus and Ahtanum Creeks |
K: 157. Conduct steelhead and bull trout spawner surveys |
|
06/30/2016 |
09/30/2016 |
| Redd distribution and adult abundance index |
L: 162. Analyze redd count data |
|
08/01/2016 |
08/01/2016 |
| Steelhead Outmigrant metrics |
M: 162. Analyze Steelhead Outmigrant Data |
|
08/01/2016 |
08/01/2016 |
| Water temperature record |
N: 157. Collect water temperature data |
|
01/08/2017 |
01/08/2017 |
| Weekly manual discharge measurements |
O: 157. Collect discharge measurements |
|
02/28/2017 |
02/28/2017 |
| Monitor water level in monitoring wells |
P: 157. Collect data from monitoring wells |
|
02/28/2017 |
02/28/2017 |
| Wapato Irrigation Project diversions managed for minimum instream flow. |
Q: 186. Assist with the operation of diversions and screens on Ahtanum Creek |
|
02/28/2017 |
02/28/2017 |
| water diversion managed at 6 diversions to provide minimum streamflow |
R: 186. Assist with operation of diversions and screens on Toppenish Creek |
|
02/28/2017 |
02/28/2017 |
| Functioning fences, wells, stock tanks, and habitat improvements |
S: 186. Maintain livestock wells/stock tanks/livestock fences/improved springs |
|
02/28/2017 |
02/28/2017 |
| Maintain vegetation |
T: 198. Maintain pre-existing vegetation |
|
10/31/2016 |
10/31/2016 |
| One completed Reach Assessment |
U: 115. Do a Reach Assessment on the middle of Simcoe Creeek from river mile 5.9 to 18.9 |
|
02/28/2017 |
02/28/2017 |
| Construction contractor |
V: 122. Constuction consultatant on restoration projects |
|
05/02/2016 |
05/02/2016 |
| Engineer design and plans |
W: 175. Toppenish Creek Levee Setback Design |
|
05/01/2016 |
05/01/2016 |
| Completed channel construction |
X: 30. Ahtanum Creek at 62nd Floodplain and Channel Construction |
|
02/28/2017 |
09/30/2016 |
| Completed channel construction |
Y: 30. Toppenish Creek at RM 37 Floodplain and Channel Construction |
|
02/28/2017 |
09/02/2016 |
| Buck and Pole Fence |
Z: 40. Lakebeds Meadow Buck and Pole Fence |
|
10/31/2016 |
|